-
Interim Technology Caps - 12.5 MW
The application list was reviewed after the first day. It was determined that the caps for Solar and Biomas have been exceeded. A lottery was held to dermine which projects fall within the technology caps.-
Resluts as of October 22, 2009
-
Results as of October 22, 2009
-
