• Summary
  • 2012 SPEED Goal
  • Projects
  • Maps
  • Utilities
  • Certificate Public Good
  • FAQ

VermontSPEED
  • Summary
  • 2012 SPEED Goal
  • Projects
  • Maps
  • Utilities
  • Certificate Public Good
  • FAQ

SPEED PROGRAM
  • Summary
  • 2012 SPEED Goal
  • Projects
  • Maps
  • Utilities
  • Certificate Public Good
  • FAQ
STANDARD OFFER PROGRAM
  • Summary
  • 2013 Program Changes
  • 2013 RFP
  • RFP Q & A
  • Information For Bidders
  • Avoided Cost Price Caps
  • RECs
  • Contract
  • Accepted Projects
  • Waiting List
  • 150 kW or Less
  • Net Metering
  • Board Orders
  • FAQ
PRODUCTION
  • SPEED Monthly Production
  • SPEED REC Distribution
  • SPEED ON LINE PROJECTS
  • SPEED PRORATA SHARE
CONTACT VEPP Inc.
  • Contact Information
LINKS
  • VEPPI.ORG

 

 

Standard Offer FAQs

Search the FAQ for entries containing:
  • SITE CONTROL (5 entries)

    • What is needed to document Site Control?
    • Do I need to identify a specific site in order to participate in the RFP?
    • If I learn at a later date that the site I have identified is not suitable, can I change the location of the project?
    • I own a parcel of land large enough to build a 10 MW solar farm, however I know that Act 45 limits project size to 2.2 MW. Can I configure my project as 5 - 2 MW projects?
    • I’m in negotiations with a landowner for site control. I will not be able to complete these negotiations until after I submit my proposal. Will this be a problem?
  • STANDARD OFFER ELIGIBLE PROJECTS (6 entries)

    • What types of projects are qualified to bid for a standard offer contract?
    • I have several projects I would like to submit bids for. Is this allowed?
    • I am not the plant owner, however I would like to apply on behalf of the plant owner. Can I do that?
    • I have heard that because of the monthly Facilitator Fee it isn't worthwhile submitting a proposal for a residential size system. Is that true?
    • I am planning a biomass plant using wood resources. Can I submit a proposal??
    • The generating equipment at my project consists of a 40 KW engine and a 75 KW generator. What is my plant capacity?
VEPP Inc. • 1965 Depot Street • P.O. Box 1938 • Manchester Center, Vermont 05255 • Telephone: 802-362-0748