Summary
2012 SPEED Goal
Projects
Maps
Utilities
Certificate Public Good
FAQ
Summary
2012 SPEED Goal
Projects
Maps
Utilities
Certificate Public Good
FAQ
SPEED PROGRAM
Summary
2012 SPEED Goal
Projects
Maps
Utilities
Certificate Public Good
FAQ
STANDARD OFFER PROGRAM
Summary
2013 Program Changes
2013 RFP
RFP Q & A
Information For Bidders
Avoided Cost Price Caps
RECs
Contract
Accepted Projects
Waiting List
150 kW or Less
Net Metering
Board Orders
FAQ
PRODUCTION
SPEED Monthly Production
SPEED REC Distribution
SPEED ON LINE PROJECTS
SPEED PRORATA SHARE
CONTACT VEPP Inc.
Contact Information
LINKS
VEPPI.ORG
Standard Offer FAQs
Search the FAQ for entries containing:
SITE CONTROL
(5 entries)
What is needed to document Site Control?
Do I need to identify a specific site in order to participate in the RFP?
If I learn at a later date that the site I have identified is not suitable, can I change the location of the project?
I own a parcel of land large enough to build a 10 MW solar farm, however I know that Act 45 limits project size to 2.2 MW. Can I configure my project as 5 - 2 MW projects?
I’m in negotiations with a landowner for site control. I will not be able to complete these negotiations until after I submit my proposal. Will this be a problem?
STANDARD OFFER ELIGIBLE PROJECTS
(6 entries)
What types of projects are qualified to bid for a standard offer contract?
I have several projects I would like to submit bids for. Is this allowed?
I am not the plant owner, however I would like to apply on behalf of the plant owner. Can I do that?
I have heard that because of the monthly Facilitator Fee it isn't worthwhile submitting a proposal for a residential size system. Is that true?
I am planning a biomass plant using wood resources. Can I submit a proposal??
The generating equipment at my project consists of a 40 KW engine and a 75 KW generator. What is my plant capacity?
VEPP Inc. • 1965 Depot Street • P.O. Box 1938 • Manchester Center, Vermont 05255 • Telephone: 802-362-0748