SPEED Program
Project Status
Utilities
FAQ
248 Certificcate of Public Good and SPEED Projects
SPEED Program
Project Status
Utilities
FAQ
248 Certificcate of Public Good and SPEED Projects
General Information
SPEED Program
Project Status
Utilities
FAQ
248 Certificcate of Public Good and SPEED Projects
Standard Offer Program
• Standard Offer Program Summary
• Standard Offer Rates
• Application for Standard Offer
• Application Instructions
• Standard Offer FAQs
• Standard Offer Contract
• Compasrison - Net metering to Standard Offer
• Technology Lotteries
• Applications being Processed
• Applications not yet processed
> Short Form CPG Application <= 150 kW
• Website Addendums
Standard Offer FAQs
Search the FAQ for entries containing:
Site Control
(5 entries)
What is needed to document site control?
Do I need to identify a specific site in order to get into the queue?
If I learn at a later date that the site I have identified is not suitable can I change the location of the project without losing my place in the queue?
I own a parcel of land large enough to build a 10 MW solar farm, however I know that Act 45 limits project size to 2.2 MW. Can I configure my project as 5 - 2 MW projects and be eligible for Standard
I’m in negotiations with a landowner for site control. I not able to complete these negotiations until after I find out if I am in the queue. Will this be a problem?
Eligibility for Standard Offer rates
(9 entries)
What types of projects are eligible to apply for a Standard Offer contract?
I have several projects I would like to make Standard Offer applications for. Is this allowed?
I am not the plant owner, however I would like to apply on behalf of the plant owner. Can I do that?
I applied for my project last spring under the net-metering Rule. Can I get the 30¢ rate?
I am planning to put 6 KW of solar panels on the roof of my house. Can I get the 30¢ rate?
I have heard that because of the monthly administrative fee it isn't worthwhile applying for a residential size system. Is that true?
I am planning a biomass plant using wood resources. Is my project eligible for the Standard Offer rates?
For a solar project there is a 15% to 20% de- rate when the output is converted from DC to AC. How do I figure out what the plant capacity is for my project?
The generating equipment at my project consists of a 40 KW engine and a 75 KW generator. What is my plant capacity?