SPEED Program
Project Status
Utilities
FAQ
SPEED Program
Project Status
Utilities
FAQ
General Information
SPEED Program
Project Status
Utilities
FAQ
Standard Offer Program
• Standard Offer Program Summary
• Standard Offer Rates
• Application for Standard Offer
• Application Instructions
• Standard Offer FAQs
• Standard Offer Contract
• Compasrison - Net metering to Standard Offer
• Technology Lotteries
• Applications being Processed
• Applications not yet processed
• Website Addendums
Standard Offer FAQs
Search the FAQ for entries containing:
Site Control
(5 entries)
What is needed to document site control?
Do I need to identify a specific site in order to get into the queue?
If I learn at a later date that the site I have identified is not suitable can I change the location of the project without losing my place in the queue?
I own a parcel of land large enough to build a 10 MW solar farm, however I know that Act 45 limits project size to 2.2 MW. Can I configure my project as 5 - 2 MW projects and be eligible for Standard
I’m in negotiations with a landowner for site control. I not able to complete these negotiations until after I find out if I am in the queue. Will this be a problem?
Eligibility for Standard Offer rates
(9 entries)
What types of projects are eligible to apply for a Standard Offer contract?
I have several projects I would like to make Standard Offer applications for. Is this allowed?
I am not the plant owner, however I would like to apply on behalf of the plant owner. Can I do that?
I applied for my project last spring under the net-metering Rule. Can I get the 30¢ rate?
I am planning to put 6 KW of solar panels on the roof of my house. Can I get the 30¢ rate?
I have heard that because of the monthly administrative fee it isn't worthwhile applying for a residential size system. Is that true?
I am planning a biomass plant using wood resources. Is my project eligible for the Standard Offer rates?
For a solar project there is a 15% to 20% de- rate when the output is converted from DC to AC. How do I figure out what the plant capacity is for my project?
The generating equipment at my project consists of a 40 KW engine and a 75 KW generator. What is my plant capacity?